Answer Posted / awadhesh kumar sharma
600MM ABOVE FLOOR LEVEL AND 600MM BELOW BEAM LEVEL THATS MEANS WHEN CLEAR LENTH OF COLUMN IS 3M THEN LAP ZONE IS 3-.6-.6=1.8
Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Why is the statue of liberty made of copper?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Ratio for 4500 psi concrete
In cement making,what is meaning of blend,fineness,density.
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
What are the applications of the modulus of elasticity?
what is your role of in previous company as a construction manager
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Formula of area of crane hook
how many BSCs can i connect to the HUAWEI MSC
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is the method of soil replacement test?
if the nitrates more than 45mg/l in water lead to disease then what is it called