DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / o.ravindra reddy
A-Check Daily basic
B-Check 250-300hrs and 6months
c-Check 1500hrs and 1year
D-Check 6000hr cycle
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
is there any chart showing the suitable cable size according to AMP and length ? for three phase motors
What is the maximum No. of out going mccbs permitted from an LV distribution paqnel? What is the ampere relation between incomer and out going switch gears/mccbs?
How can we increase fuel-power ratio of any DG set?
HOW TO CALCULATE ELECTRICAL, MECHANICAL,& OVERALL EFICIENCY OF GAS ENGINE POWER PLANT
What does the term power factor shows?
Why magnetic flux produces an induced current?? what is the detailed procedure ?? ans plz
can we do the star delta connection of capacitor for 3- phase motor starter.
Why using synchronising methed in DG's sets?
1. transformer design formula ? 2. how to calculate the primary turns and secondry turns ? 3. core types ? 4. how to find the primary current and secondry current ? 5. how to calculate the stacking factor ? 6. range of fulx density ?
What will be the effect of circulating current in HT xlpe cable when both the armour ends are grounded. Will the termination fils after some time in case of 33 kv supply.
How to findout raw or ups power? its not indicated in socket,
what is the difference between an alternator and a synchronous motor
can any tell me why slope 40% and 80% is calculated in differential protection?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?