how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / ganesh mapari
7 Day for Brickwork and Plastering
14 Days for Concrete
| Is This Answer Correct ? | 36 Yes | 3 No |
Post New Answer View All Answers
what is meant by residual strain?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
How to do base isolation for RC framed structure using ETABS software?
What are the different methods for drawing an arc?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Minimum concrete cover in slabs, columns, beams, foundation and other st?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
is concealed wiring a problem in fly ash brick wall?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
what is the hanekom repairing material after concreting work
How to calculate the force on a column of three story building. What should be the base concrete height?.
Permissible wastage of cement as per IS code ? In which IS code I get it?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Which ratio use for cement selery???