Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In a thermal power plant ID Fans running with full load but
boiler load is only 80 % give reason ?

Answer Posted / mohamed elnakib

it is due to the air preheater being clogged increasing the
load of the ID fans due to the bad suction and this clogging
is mostly due to the baskets being melted due to the
formation of the ACIDS from the exhaust gases and the dew
point effect .


this is the only logical reason for why the ID fan is 100%
loaded while the boiler is not .

Is This Answer Correct ?    12 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference between secondary Air & Tertiary Air and Their use.?

2017


How We Calibrate the vaccum transmitter?

1986


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3421


LAPT working in alternator / generator

3647


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2305


explain how the third harmonic content of the magnetising current affects transformer design

3303


what is restricted earth fault explain in details

2065


what is the difference between compensated & normal drum level in boiler drum?

1820


what is the trip circuit supervision in an electrical meaning?

2148


operation

1920


How to calculate power press toneage

2082


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1018


what does mean by kva rating

1530


What is LB-SR.

3028


what's the moog valve

1521