Answer Posted / ty
10-20 mm
Is This Answer Correct ? | 8 Yes | 8 No |
Post New Answer View All Answers
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
any book or article on pumped concrete.
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Explain what are the problems one might face while having a Cantilever balcony?
What is meant by dimensioning?
how to nfind out the specific gravity of sand.aggregate,water please help...
Explain the different types of building contracts?
What is the difference between Grade I, II and III of GSB?
What is the difference between a wood shake and wood shingles?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Minimum concrete cover in slabs, columns, beams, foundation and other st?