how many cubic ft. for 50 kg ( 1 bag ) cement?

Answer Posted / m.senthilkumar

1440kg (28.80bags)=1cu.m ; 1cu.m=35.3147cu.ft

so1440kg (28.80bags)=35.3147cu.ft

50kg (1bag)=(35.3147*50)/1440

50kg (1bag)=1.2262cu.ft

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3713


115mm thickness brick work how to required mortar

1630


What are the steps involved in the concreting process?

866


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

1850


How to calculate carrying capacity of the existing water supply trunkmain

1806






hi guys what happens if you are absent for a supplymentry exam?

1378


What is the purpose of Chipping in the heavy foundation?

999


Define What is diversion tunnel in a dam?

750


how can i calculate cement in brickwork

3462


Define relative co-ordinates?

693


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

1646


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

2326


What are the different softwares used for cad?

720


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1710


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1020