we calculate the qty of cement,sand ,aggregate in cu.m,then
we multiple specific weight * qty of cement calculated =
qty in kgs

example 1:2:4

cement specific weight 1440kg/m3
cement qty in cu.m = 0.22
cement qty in kg = 0.22*1440=322kg
sand,aggregate specific weight 1840kg/m3,1550kg/m3

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is make concrete cube?

710


what is the hanekom repairing material after concreting work

1925


The foundations are placed below ground level, to increase?

792


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2607


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5613






How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

1879


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1734


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1644


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1448


How many bricks are there in 100cft?

846


Explain what is the release of lien?

669


how to calculate the length diamond shaped striupps in column

2210


What is proportion of PCC Grade G?

1605


on what basis the partial factor of safety are decided? form the load combinations

1811


Explain the difference between slab and beam?

671