In a given rcc design, how to calculate quantity of steel,
for all practical purpose of construction?
Answer Posted / er satyavir singh kashyap
FOR FOUNDATION 50KG PER CUM
FOR SLAB 80KG PER CUM
FOR BEAM 110 KG PER CUM
FOR COLUMN 160KG PER PER CUM
FOR WALL 80 KG PER CUM
FOR SHELVES 80KG PER CUM
FOR STAIR CASE 100 KG PER CUM
Is This Answer Correct ? | 24 Yes | 4 No |
Post New Answer View All Answers
What is the diff between cad & cadd?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
What is the usage of zoom command?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is a kip?
What is the outturn of Ceiling plastering
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What are the different methods for drawing an arc?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?