a power supply to be constructed from voltage cells is
required to provide Max. 20A Current with a terminal voltage
of 6v.Several voltage cells are available each of which has
terminal voltage of 1.5V & each of which can supply a max
current of 5A .the no of cells required will be ??
Answer Posted / adeel
How?????
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why we use ac supply as 415 volts instead of 415 v why we cant apply 230 v for dc
What is the voltage gain or transfer function of amplifier?
why we use two slope(differential & restraining) in differential relay.but in busbar protection differential we are using only one slope?please explain
What are the protections for safe running of electric generator?
what is the value of combined earthing in general electrical circiut?
what is the effect of back reactive power on the generator ?
How to calculate multiplying factor of dc energy meter
How many types of protection relays are there based on the characteristic?
why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?
Does magnetomonopoles exists? one maxwell equation strongly suggests no, but how about their existance in plasma?
PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com
How to calculate the Efficiency of Chiller
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
Load transfer in 11kv double busbar switchgear - operation.
How to resolve if Diesel generator stop while running ?