Answer Posted / guest
Depends upon loads
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Material calculation of cm 1:6 for 1sqm
How to do base isolation for RC framed structure using ETABS software?
what is the difference b/w full length and cutting length?
What is absolute coordinates?
Explain what is progress payment?
How much is the cover for slab?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
Basic questions of civil engineering
mix design procedure for 1:6 cement mortar
How to calculate woden area in sft and Cft
Define What are the reasons for geotechnical site investigations in Uganda?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar