how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / engr.sameer
concrete need min 7 days contineous curing
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is portland cement
HOw much % of premium on DSR-2013 currently
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
why we are useing plastic under the lean concrete?and whts the advantage?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
What are the RISKS during the project construction?
How do you measure water flowing through 300mm diameter pipes?
What is horizon or horizontal mining?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
can i get civil engineering test papers.......?????
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
how to find out hard strata in bored pile when the DMC method adopted.