what if tie beams coming from x axis do not meet tie beam
coming from y axis? Is it safe if they dont meet?

Answer Posted / umar farooq

ITS NOT SAFE , TIE BEAM IS REQUIRED FOR JOINED THE COLUMN,SO TIE BEAM MUST MEET EACH OTHER .

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

1569


Can we apply curing compound on ceiling (slab Bottom)

368


Test procedure of fly ash bricks as per code ?

2127


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

733


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

1675






Are you ready to relocate with your immediate family to United States as a new employee?

4877


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2607


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

1811


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1636


How cracks in concrete can be avoided?

646


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

1651


why +1 to be followed for calculating the no of bars in BBS. Please explain

1517


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

1529


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2409


what is floating slab foundation?

674