Providing cement based water proofing treatment to terrace
(Indian water proofing) with brick bats with cement morter
(1:5) and (1:3).
what are rate in cum or sqm.
Answer Posted / ashish deshpande
depending upon locations and prise of materials and labour
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Explain what is zoning permit?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Difference between pre-tensioning and post-tensioning.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
Define What is the distance between railway tracks?
difference between fc and fc'?
sir please send me campus placement questions in civil engineering
Forces in a Shear Wall are in plane or out of plane ?
Explain what is structural frames or systems?
Define line type?
IS code for Rolling Margin of steel
how i get all type of short type question answer about civil engg