what is design mix of M10, M20, M35, M40 grade of conconcrete?
Answer Posted / swapan
for design mix have to keep it mind that upto M25 termed as nominal mix where there is a specific ratio for each grade of concrete suppose M15(1:2:4)/M20(1:1.5:3) but from M30 design procedure shoul follpw SP23 code.
Is This Answer Correct ? | 29 Yes | 2 No |
Post New Answer View All Answers
what is the meaning of 40/20 src
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Explain what is the difference between built area and super built up area?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
What is the cost difference between site mix and ready mix concrete per cubic meter
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is absolute coordinates?
how to calculate rate analysys of 1:6 plastering 10 sq m
How to do base isolation using ETABS software?
What is the l/d ratio of cantilever beam?
how can we calculate steel value, depending on load
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Why should you consider yourself fit to be hired by jindal steel.
Define What is rigging?