how many covering can be taken in the beam,column & slab also
stair-case?
Answer Posted / karunakaran
Under normal conditions provide clear cover
beam- 2.5cm
column-4.0cm
slab- 2.0cm
stair-case-2.0cm
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
what is Short bored pile foundation.
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
What are the different types of runners?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
what is anchorage length,lap length and (dont remember the last one)
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
it is a corrected question." make a list of engineering property(properties) of soil.
give me the rate analysis for Bituminous Macadam and SDBC
What is Curtailing of R/F
What glue is least sticky?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
What is the difference between Grade I, II and III of GSB?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25