Construction joint of beam & slab is provided at––
Answer Posted / nilesh kulkarni
L/3 zone of span length of beam or slab
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
why do we not deduct volume of steel to find actual volume of concrete in practical???
How many mortar required for Brickwork of 1 Cu.m works??
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
how to calculate freeboard in under ground water tank and technical details
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
at which depth the construction of tunnel is economical from cost and engineering aspect.
what is civil enginnering & what you need of this course?
what is the difference between natural draught cooling tower and induced draught cooling tower
The mixture of different ingredients of cement is burnt at?
Which are the top apps for you civil engineer?
Explain the Strength of brick?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Which type of plywood & sizes using in construction projects ?