Slow setting admixture is used in mass concrete because of –
–
Answer Posted / raj
to postporn the initial setting time of concrete... why because if we need transport the concrete so far. we can't control the initial setting time in ordinary concrete so we use slow setting admixture to extend the initial setting time of concrete.
Is This Answer Correct ? | 23 Yes | 0 No |
Post New Answer View All Answers
What is the zero value in quantity surveying
why are you joining in this (applied post) job and your aim for this job
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
what do you understand by M25 concrete
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
mix design procedure for 1:6 cement mortar
Coverage of 25mm.thick ratio of 1:4 cement mortar?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
What do you mean by the word 'shear'?
What Are The Different Type Of Slump Test Indications?
Define What is passive earth pressure ?
what is escalation?how it is done?
How you can use different dimension tools in cad? What are the different dimensions available?