If the design mix of M-30 grade concrete is 1:1.5:2.8 (By
Weight)& W/C ratio is 0.45, then what should be the
volumetric mix for the same ?
Answer Posted / partha mitra
M-30 grade concrete is a mix design,there is no volumetric
mix in M-30 grade of concreate.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Tell me about triple point of water.
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
sir how can we find the cement and sand required for making 4" drop
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Will water damage concrete?
what is the permanent solution applied for restoration of leaning tower of pisa?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
How many days should curing of plastering, brick work and concrete
how many material required for brickbat water proofing of toilets.
How to calculate material and labor required for 100 m2 plaster?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??