the volume of 50kg bag is
27 lit
24.7 lit
44.7 lit
42.9 lit
Answer Posted / sana ullah
We konw, Unit weight of cement = 1440 kg/cum
i.e. 1440/3.28^3 kg/cft
= 40.80 kg/cft
1 bag cement = 50 kg,
Then, 1 bag of cement = 50/40.8 = 1.23 cft = 34.72 litres
so none of above given options are correct.
| Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
why we are using stub column..? is it possible to construct steel stub column..?
pls give me ans to ACT formula cube testing porpuse
how to clculate the %of concrete strenght achive after curing?load
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
what is the difference between tsp & tower
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
how to calculate the scour depth
What is thumb rule for deep trench excavation
rate analysis hiring of generator 62.5 KVA
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
strength vs shape factor
States some of the tool bars used in cad?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
silt%= silt volume/ silt+sand volume is this right?