What are the methods to do a estimate.

Answer Posted / guest

long & short method & center line method

Is This Answer Correct ?    34 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

1409


What is the general specifications of a bituminous pavement road?

1237


What is the Roll of Water Bonding under VDF road?

2124


Define What materials were used to build the Golden Gate Bridge?

641


The largest size of paper used in plotter to print the drawing made by Autocad .

1300






1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1689


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4280


Define What is the meaning of a blue land surveyors flag?

765


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1675


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1837


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

1896


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1412


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2368


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2857


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1333