i am iti student i have project to do. that IS 100MW
220\33KV SUBSTATION I WANT TO KNOW HOW TO START, LIKE
CALCULATION, WHAT RATING OF CT,CVT, PT, ISOLATOR LIGHTING
ARRESTER WAVE TRAP CIRCUIT BREAKER IN 22OKV SIDE, ALSO TO
WARDS 33KV SIDE PLS HELP ME WITH THIS, THIS MY LIFE NOW, I
KNOW AUTOCAD, I LIKE TO KNOW HOW TO CALCULATE ALL THE THINGS
Answer Posted / surya
i need the calculation methods so i can do it for my self
pls help
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
List the advantages of star-delta starter with induction motor?
what is the id1 & id2 setting in differential protection relay of CSPC?
what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.
why US countries maintains 110v and 60HZ
Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?
What happened if C.T mount at any cable or Bus bar in wrong direction . C.T going on proper work or not . C,T direction is essential thing to properly work.
by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.
it is in our knowledge tht right plug of supply of residential suppy system is phase n other is neutral...howevr the battery charger of mobile works in both ways...i mean it is not restricted in only one direction.ny of the holder of charger can hav phase .so y is it not lik tht phase of supply must b connected 2 phase of charger...?
what is the safety of voltage power transformer(2250KVA0
what is mean by descripiency relay? & wht is its ansi code?
What is the de rating factor of cable? What is the importance of the de rating factor in cable select
How to work definite,over pluxing,revers power,OSR relay
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.
Do any one know exacatly when the results for NHPC held on 8th march 09 for engineering trainees will be released ?. if so please post it, i'm eager to know it.
how to select fuse rating for a 3-phase motor ???