In a given rcc design, how to calculate quantity of steel,
for all practical purpose of construction?

Answer Posted / muhammad younas

calculation for one meter is d*d/162.162 d=dia of steel (mm)

than mutiply by length of steel bar

Is This Answer Correct ?    13 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Time required for curing of wall tiles before fixing

1772


What things architect have to take care of before starting any project?

751


specifications of fe500 steel

3048


Why are the bolts that hold steel rails together in oval holes?

703


How do we test on design and style in a software?

681






what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

1844


What will you do if you encounter problems like accidents?

613


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

1414


How can you distinguish between sorption, absorption and adsorption?

752


how to convert cement, sand aggregate quantity from M3 to kg with full description?

1594


What you understand by richter scale?

714


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1808


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4658


What is the l/d ratio of cantilever beam?

1452


what does the track parameter mean in staad.pro?

5461