Answer Posted / binod
THE FOLLOWING TEST ARE THE MINIMUM REQUIRED BEFORE CHARGING
A TR.
1)short cicuit test
2)opencircuit test
3)insulation test
4)magnetic core blance test
5)tan delta test
6)transformer oilo B.D.Vtest
7)silicagel color test
8)w/t&o/t functioning test
9)buchhols contact operation test
10)prv working test
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
is IS says that neutral should be brought to switch box. and this one is a recomended practice
how to measure the transformer resistance values(dyn11)?and howmuch the minimum value?
what is doubling factor in making current of a breaker?
What happen if 200 KVAR capacitor connected to power continuesly?
how can i get the formula to find out the cable size if i know the load of main fuse protection.
What are the major reasons for balancing hydro-thermal mix?
Which Class insulation is prefered for the sandwich Busducts ? Why?
1sq mm dc powr cable can carry how much dc currnt
what is doid
tell me about roaster switch .& what is the function in transmission & distribution?
what type of questions are asked and howmwny questions belong this catagory?
I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??
what are the steps involved in generator load test?
How time response of the system is divided?
Why a tesa lamp is glow between two phase?