what is the salry which I am expect in kolkata for diploma
in civil engineer with 3 years 6 month exp.???
Answer Posted / senthil
15000 per month
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
explain what do you mean by the property development.
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
what is called the inverd level of mabhole chamber?
what could be the production cost of 1 cum of concrete by CP30 plant
Aptitude, reasoning, quants, verbal and technical question
how to identify the failure of building by expansive soils
what is the most suitable foundation when construct a bird watching tower in a marshy land
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
What is the difference between one-way slab and two-way slab?
Which code is used for tor & tmt steel bar?