how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / ram mohan rai
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
psc girder detail
what do you understand by M25 concrete
How many pyramid in egypt?
how we can find sieve #4 is 4.75mm?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What is the difference between Grade I, II and III of GSB?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What black man invented the clothes dryer?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
sir, whitch is the best book (writer name) for prepration of gate....