Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

ALONG WITH
MEGGER TEST FOR
CHECKING OF
MOTOR ,WHY WE
MEASURE FOR
RESISTANCE AND
INDUCTANCE?

Answer Posted / ramesh

Insulation test for checking of winding healthy condition,
If any short circuit inside area, the motor cannot operate.
So that before energised motor, insulation test to be done.

Is This Answer Correct ?    8 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2034


How PSV sizing being done

2337


Vaccum circuit breaker

1395


What is meaning of out of phase (making & breaking) capacity And how to calculate

2255


What is meant by cold loop test in instrument

2633


which fault is severe and why?between lll fault and lllg fault which fault is severe and y?

2510


what is the sludge current

2135


design of IGBT firing circuit for 11KV

2648


What are the two segments of nyquist contour.

1115


hai now i am working as a electrical design engineer in construction field can i get a job in oil and gass field or power plant project as a electrical design engineer?

1926


54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?

2194


Pls Breifly explain about UPS (Inverter,Reserve,Rectifier,Float voltage,Boost voltage).

2793


Hello Guys !! i want to rrb section engineer electrical(signal) previous model papers? any body help me?

1913


why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.

3119


write circuit diagram for a motor rotate in forward direction once it started and when pressed the same button it should rotate in anticlockwise.

2571