what is the shuttering normal clear cover for footings,
walls, beams & columnms

Answer Posted / silambarasan

column is 25mm-50mm beam is 40mm slab is 20mm footing is 50mm-75mm

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between one-way slab and two-way slab?

666


In reclamation works what are the importance of geotextiles and sand?

695


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

1803


in plate load test what is the thickness of plate 20mm 5mm 50mm none

1710


why do we not deduct volume of steel to find actual volume of concrete in practical???

1323






What is a kip?

717


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

663


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1369


What is limit state method and working stress method and ultimate method

1134


what is concrete canvas?

1770


how to calculate the strength of rebound hammer test reading in building construction ?

2882


How much time Required for PPR pipe network testing

1691


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1396


Why should appointment store person for project ? what is the benefits for company ?

615


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390