Answer Posted / snigda
With in 2.5 hrs, the mix should use otherwise the water
content which is added in composition will absorb by mortar
and mix will become tight.
Then, we have to add the water, where water content for that
mix will increase. Because of the same, Silt content will
increase where cracks develop on the structure (for finishes)
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
How to determine spacing of bars in slabs or beams
What is the tallest man made structure in the world?
what is the dimensions of river sand truck trailer or trolly ?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
which method is used in semi-rigid connection design??
can any one explain bar bending schedule of bems and columns and slabs ??
What is pre-stressed concrete?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
types of survey and levelling instrument ?
How to find out slope footing concrete
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is features of a typ-ical modern air-conditioning installation?
What are the different types of runners?