What is the percentage of wastage in cement n how to control it?
Answer Posted / vishal
Wastage for cement is maximum 3%.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
dialation means
Why the finite element method is lower bound solution?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
what is the effect of duration of earth quake on framed structures ?
How many % we consider for lap for reinforcement for estimates
how we calculate the vol.of wet concrete..?
What is geopolymer based concrete?
Difference between lime, distemper and plastic emulsion?
what's the formula for calculate pcc for matt(45mm aggregate)?
what is polity
What do you mean by honeycomb in concrete?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is Rankine Cycle?
What is an ice dam sock?