how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.
Answer Posted / hitenpatel
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
what is the tensile strength of 10swg and 8swg gabion wire?
pile load testing procedure
60-70 grade of Bitumen is VG-30 ?
brickwork labour rate per cum ?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
material used for mendrel use to bend epoxy coated rebar
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
Consumption of Binding wire for fixing of cover block in vertical surface
what is the construction cost for per cft of multistorryed building in kolkata?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
types of laps in column