Answer Posted / vijendrasinh
45000 nos
Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
from where ican get sample papers for CET-delhi 2012
Explain the difference between slab and beam?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
2. What are the advantages of your present job, things you like about it?
What is bylayer?
What are the applications of modulus of elasticity?
How much cement will require for 1Rmt Skirting laying
How to calculate volume of concrete & steel on tank foundation & ring wall ?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what are the code used for residental building?
For fine aggregate which is most suitable River sand or crusher sand & why ?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
Difference between pre-tensioning and post-tensioning.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.