test procedure of fly ash bricks as per code

Answer Posted / dvn potharaju

SO FAR NO CODE WAS DEVELOPED FOR FLY ASH BRICKS

BUT CAN BE DONE AS ORDINARY BRIBKS

Is This Answer Correct ?    2 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the techniques to measure road difference?

764


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2118


What is gravity flow?

685


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1289


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1878






roll of DLC in road constructions

1417


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

5819


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

2160


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1968


In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed

2706


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1890


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1593


How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument

1735


Does brick grows bigger every year?

673


cause of cylinder test failure

2836