Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / abid

h/6(a1+a2+4a m),
a1= area of top
a2= area of bottam
am=average of both area
h= height at mid (like:-D)

Is This Answer Correct ?    53 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1616


How do you maintain water pressure?

657


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1134


what could be the production cost of 1 cum of concrete by CP30 plant

1275


how to clculate the %of concrete strenght achive after curing?load

1937






How to get MEP technical,instaaltion & testing data for interview?

1609


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1697


What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2111


What is the meaning of soil reinforcement?

668


significance of specific surface area of particles?

1640


what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same

1709


Define What is a projection line?

666


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

697


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

1891


Define aligned dimension?

668