Answer Posted / vinay arora
the process establish plane table W.R.T. two point on the
ground, whose position already drawn on the plan.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What is rigging?
at which depth the construction of tunnel is economical from cost and engineering aspect.
Explain major differences between routing maintenance and major maintenance.
Why are the bolts that hold steel rails together in oval holes?
150mm bricks size how many use 4.14 m3
What things you need to take care of before building a kitchen island?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
silt%= silt volume/ silt+sand volume is this right?
how to calculate number of bitumen for road asphalt
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?