Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / jayanta madhab

Attemperation required to protect costly superheater and
evaporator tubes from overheating during flue gas
temperature variation.

Is This Answer Correct ?    3 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why airtel use + 24 volts and other operators use -48 volt

2108


what is the basic use of power plant in equipment

1231


explain how the third harmonic content of the magnetising current affects transformer design

2773


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

518


what is natural frequency of turbine shaft .

1731






LAPT working in alternator / generator

2552


Why superheated are started before I'd and rd fan?

1696


What is difference between secondary Air & Tertiary Air and Their use.?

1481


what is restricted earth fault explain in details

1628


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2072


what's the moog valve

1057


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1482


what is the difference between compensated & normal drum level in boiler drum?

1292


can dp type level transmitter work in under vaccum condition

1543


what is the meaning of SST300 V56A in SIEMENS turbine

3888