Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the I.S. CODE of RCC

Answer Posted / r.sridhar

IS 456-2000

Is This Answer Correct ?    19 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why top layer of block work shoud be full size if any cut block adjustable than another layer?

2202


What is binding spacing of the rebars at lapping zones.

1311


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

2515


pls give me ans to ACT formula cube testing porpuse

3087


what is the difference b/w full length and cutting length?

2227


Explain what is structural frames or systems?

1150


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1638


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1938


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

2442


Explain how you can use different dimension tools in CAD? What are the different dimensions available?

1100


What is critical path method (c.p.m)?

1156


Why the finite element method is lower bound solution?

2984


how i can tak Quantity of mortar in block work

2397


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

2087


Prepare a Schedule for a Highrised building from starting stage to Handover?

1987