How can we save theft of wire after finishing of wiring
work, plz suggest another answer other than security or
supervisor's work?
Answer Posted / pradyumna171
NO, NC coil Contactor and one siren may be used to solve this problem.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how to modify DOL control panel into Delta Y connection?
why single phase to grd test in HV cable?why not 2 phase at a time?
What will be the output voltage of a transformer if it is primarily energized from a square wave voltage source?
Draw torque - speed curve and load curve of induction motor? mark operating point ?
Why hydropower stations are preferred solution for meeting peak loads in grids?
Metal covered multiconductor cables shall employ a marker tape located within the cable running for its complete length in lieu of cable surface marking. Is it true or false?
What is the difference between voltages or potential difference? And what are they?
Difference between On Line capacitor and Station Type capacitor.
why various test are performed on electrical panels & power cables before commissioning on site & what are these test???
What are two contours of nichols chart?
why we use the 100% and 95% stator earth fault protection for the synchronus generator ?
what irequirment need to be followed when working on live equipment
The knee point of a current transformer is normally unique and known.So why in the nameplate of a CT they put the minimum value like this Vk> 400v.
Why auxiliary transformers are not connected in parallel in primary stations?
HOW TO SET THE EARTH FAULT SETTINGS IN ACB????????????