In case of 3 phase motor why it is called single phasing by failure of one phare unless there is rest two phase are acting. ?
Answer Posted / satya dev
Basically 3 Lines are connected to the motor for operation
that is known as Line1, Line2 and Line-3 or L1, L2 and
L3.and the voltage between L1-L2, L2-L3 and L3-L1 are
called Phases. During the single phasing actualy one Line
has failed so two phases will be down and one phase will be
acting thast why it is called single phasing. single
phasing means one line failed and it will resulted two
phase dead only one phase can active.
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
what should be the no load current for 3 phase ac motors ranging from 5 kw to 1000kw?
what is counter poise conductors
i want to know that what is the eligibility critaria for ongc exam?
Why is ignitor used in sodium vapour lamp
how to CHECK CT AND PT AT THE FAULT OCCUR IN GENERATOR RELAY PANEL .
hello friends this is krunal here.. i have applied for he officer train in hpcl electrical stream.. any one who have applied before for electrical stream please help me out.. post ur reply to my mail id: krunal_airforce@yahoo.com.. any tips, old questions for paper or any help will do.. plz help me.. your faithfully, Krunal Darji
How to calculate the multiplying factor for energy meter with ct ratio given
what is the difference between oil surge relay and buchholz relay.
What is the loss of power of transformer 220kv/33kv,63/80mva of % imp12.05 at 80%load
how we calculate electrical load on a building according to area?
full form of electrical?
how to extend relay operating timing in 24V dc relay card (without using Timer )
why single CT used in DOL starter power circuit?
63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?