How to calculate the compressive strength of 28 days of
concrete where we have 7 days compressive strength?
Answer Posted / sjtbehera
compressive strength of 28 days or 7 days can be obtained
from compresseve testing machines. but As per IS code
minimum strength can not beyond strength of 28 days or 7
days
example- M 25= after 28 dyas strength should be 25 N/MM2
Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
what is meant by shear center?????
How does a traffic light signal work ?
What is difference between code and standard and specification?
How can explode a block?
What are the steps involved in the concreting process?
Why we provide hair pin for shed
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
can i get hindi version of is codes based on civil engineering?
how much to get of BRC lapping in full yield and half yield ?
what is civil engineer greatest strength and weakness?
What is command line?
what are RIB slabs explain about it
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?