how to calculate quantity of cement and sand for plastering works in CM 1:6 proportion.....plz answer anyone.....and write the formula...
Answer Posted / raheel aamir
Ratio 1:6
Cement =1/7=.143
Dry To wet =1.27*.143=.181
Weight in KG = .181*35.31*40= 256.25KG
Wastage factor @5%= 256.25/.95= 269.74Kg
Sand=6/7=.857*1.27=1.089*35.31=38.437/.9=42.71 Cft (Dry to wet =1.27, Wastage Factor= 10%)
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is absolute pressure? How absolute pressure is calculated?
how meny typs of renging rod?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What is Heavy Concrete & Normal Concrete
Please let me know what is the simplest way of Calculating Mix Designs
Why should you consider yourself fit to be hired by jindal steel.
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
any book or article on pumped concrete.
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????