Answer Posted / sjtbehera
ok we are going to mix admixture for that, but if our
concrete mixer is place near by we can handle this. main
cause of higher temp. is water evapouration. i saw mixing
of ice for that.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how can we construct building without foundation providing only grade beam at ground level
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is the mode of method of face bar measurement
60-70 grade of Bitumen is VG-30 ?
RR masonry rate analysis
can stub column take the load as main column
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Reinforcement details at hinged joint
What is the general specifications of a bituminous pavement road?
How much quantity water should be placed in one cubic meter area?
Explain the design for rcc multi-storied building?
Discuss some applications of modular elasticity?
What is Rankine Cycle?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)