If we have 15000kw connected load in a factory than how much
power demand sanction should be taken from electricity board.
Pls provide complete calculation.
Answer Posted / ashish negi
the above calculation is correct but if we have to give our
demanded load to electricity dept. than the load should be
greater than the load as on starting motors , motors take 2-
3 times the full load cureent and at that time your MDI
(maximum demand index)will go beyond the calculated load.
so in that case your have to pay the penalty. so your
demanded load should be between 2500-3000 KVA.
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Why 11kv to be generated in generation station
how to measure dc earth leakage current?
what rectifiers is and what are the types of rectifiers?
What are the roles and responsibilities of electrical engineer in cement plant
salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers
how can we change the polarity of Alternating current rapidly? how frequency of ac can be controlled and changed easily?
On Which Pressure PRV is operated.
in Telecom DC system-why positive +ve is made earthed.and - ve is fed to load.
why industry prefer ht motor instead of lt motor.
1.ZEBRA conductor(large size) 2.KUNDHA conductor( small size ) 3.panther conductor(very small ) 4.lepard conductor (very very small)
Why Transformer Neutral having one earth pit ( more earth electrode resistance) whereas body have many earth pit ( less earth electrode resistance)?
Define peak overshoot.
what is different between relay and plc?
can i use the six sigma method which is used in management area, in state estimation of power systems?
what are problems caused by the pdu in rack server