hai,i completed my b.tech civil.Recently i wrote the appsc
exam for managers water supply engg.I want answers for
general studies and civil engg paper2.If any body know or
written that exam send to my mail id is ruksana.sk08@gmail.com.
Answer Posted / rahul
be strong and keep it on
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
For fine aggregate which is most suitable River sand or crusher sand & why ?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how to identify np3 pipe and np4 pipe
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Mention different types of roof systems?
what is the percentage of silt in black cotton soil.?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
Explain how you can turn off the display for dimension in CAD?
What do you meant by gui?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,