Answer Posted / arun
when the rod is 12.12M .but length of building height is
higher than 12.12m we are provided in lap length.
it is depending upon the rod diameter.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What are the Types Of DPC and its Thickness used?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how gradation of aggregates effect on slump of fresh concrete?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
how to prepare site mix design
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What is packing Factor ?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
WHAT DLC DESIGN IN CONSTRUCTION
Why are pull-out tests performed for soil nails?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is the maximum strength of cub compress strength in one cub testing
what is the construction cost for per cft of multistorryed building in kolkata?