how much quantity of binding wire required for tieing of
1mt of reinforcement bar?
Answer Posted / saminathan
7.5kg to 9kg
Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
How much percentage of brick bats allowed in CD-75 bricks
difference between trapezoidal and pedestal footing and how the load acts on that
Water filter calculation formula
Did any of the egyptian pyramids ever fall down?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
procedure for preliminary selection of size of column of 5 storey building
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
What is Rankine Cycle?
how to calculate the steel in 500yard
How to calculate quantity of plum masonry in 1:3:7
Discuss some applications of modular elasticity?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What is the difference between engineering stress and true stress?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.