what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
Answer Posted / vigneshwaran s
Generally its easy to find it.
Find Total Parts = (1+2+4)=7 Parts.
For 1 cu.m of concrete the total parts = 1.57
Unit weight of cement = 1440 kgs
Cement = (1440/7)*1.57 = 322.97/50kgs = 6.46bags.
1 bag cement= 1.25cft
Sand = 6.46*1.25 = 8.075 cft*2 =16.15 cft
Aggregate = 8.075 cft*4 =32.3 cft.
Thats all...
Result:
Cement = 6.46 bags
Sand = 16.15 cft
Aggregate = 32.3 cft.
Regards,
Er.Vigneshwaran S
Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
What are the RISKS during the project construction?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
In block work seawalls what is the purpose of slip joints?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
what is differences between ferrock and concrete ?
what pressure the NP2 class RCC pipe can sustain?
How do you calculate the unit weight of concrete?
States some of the tool bars used in cad?
What are the steps involved in the concreting process?
how calucate cement sand ratio for plstering
What is the average density of soil?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?