Question what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
 Question Asked In Companies :: ABB, L&T, Saudi Oger, l,     < I also faced this Question! >
 Question Submitted By :: shaunpaulstar
  Answer Posted By  
 
Answer
Generally its easy to find it.

Find Total Parts = (1+2+4)=7 Parts.

For 1 cu.m of concrete the total parts = 1.57

Unit weight of cement = 1440 kgs

Cement = (1440/7)*1.57 = 322.97/50kgs = 6.46bags.

1 bag cement= 1.25cft

Sand = 6.46*1.25 = 8.075 cft*2 =16.15 cft

Aggregate = 8.075 cft*4 =32.3 cft.

Thats all...

Result:
Cement = 6.46 bags
Sand = 16.15 cft
Aggregate = 32.3 cft.


Regards,

Er.Vigneshwaran S

Is This Answer Correct ?    4 Yes 9 No


 
  vigneshwaran s
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you 571
How to plan a project 413
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ? 461
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building 482
how to calculate load bearing column 1017
What is min thickness,min grade of conc & age of PQC ? 1922
how many minimum admixtures are used in water froofing structures 350
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar 426
Why size of brick used at site is different from its standard size ? 446
1:4:8 pcc calculation 591 cu.ft 436
how many litres of enamel paint required for 5000 sft of site??  46
how to compute slab reinforcements on step by step procedures?? 1924
what is a well 288
how much cement and sand 1:6 plastering 444
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks 699
E-Mail New Answers        Answer Selected Questions