Question what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
 Question Asked In Companies :: ABB, L&T, Saudi Oger, l,     < I also faced this Question! >
 Question Submitted By :: shaunpaulstar
  Answer Posted By  
 
Answer
Generally its easy to find it.

Find Total Parts = (1+2+4)=7 Parts.

For 1 cu.m of concrete the total parts = 1.57

Unit weight of cement = 1440 kgs

Cement = (1440/7)*1.57 = 322.97/50kgs = 6.46bags.

1 bag cement= 1.25cft

Sand = 6.46*1.25 = 8.075 cft*2 =16.15 cft

Aggregate = 8.075 cft*4 =32.3 cft.

Thats all...

Result:
Cement = 6.46 bags
Sand = 16.15 cft
Aggregate = 32.3 cft.


Regards,

Er.Vigneshwaran S

Is This Answer Correct ?    4 Yes 9 No


 
  vigneshwaran s
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
what is the sequence of the activities in the typical under ground water tank including civil & MEP works. 509
What should be the Min.Penetration in a hard rock for all pile diameteres? 249
can i get civil engineering test papers.......????? 482
How to Calculate in measurement RCC Colo um Spred design for Billing 393
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks. 1081
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos. 174
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition. 321
what mean By core Billing 429
what is tie beam? & its function . uses of tie beam.  1326
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton 260
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution 415
pile load testing procedure 268
how is the reinforcement is distributed in triangular slab 307
(Project Management Topic) What are the important criteria in the successful realization of the project? 368
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon 561
E-Mail New Answers        Answer Selected Questions