Question what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
 Question Asked In Companies :: ABB, L&T, Saudi Oger, Construction, l, Isher, Spectra, Strati,     < I also faced this Question! >
 Question Submitted By :: shaunpaulstar
  Answer Posted By  
 
Answer
Generally its easy to find it.

Find Total Parts = (1+2+4)=7 Parts.

For 1 cu.m of concrete the total parts = 1.57

Unit weight of cement = 1440 kgs

Cement = (1440/7)*1.57 = 322.97/50kgs = 6.46bags.

1 bag cement= 1.25cft

Sand = 6.46*1.25 = 8.075 cft*2 =16.15 cft

Aggregate = 8.075 cft*4 =32.3 cft.

Thats all...

Result:
Cement = 6.46 bags
Sand = 16.15 cft
Aggregate = 32.3 cft.


Regards,

Er.Vigneshwaran S

Is This Answer Correct ?    4 Yes 9 No


 
  vigneshwaran s
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
how to convert cement, sand aggregate quantity from M3 to kg with full description? 231
400 ku d/c clearess ketan hota hai? 125
Civil engineering material testing Standard results 649
what is smart building materials? 379
What is geopolymer based concrete? 599
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem 1187
What is difference between code and standard and specification? 562
How we calculate the service time of buildings 127
Technical Question of Civil Engineering 648
what is work of planning deptt. in any construction compny (in road project) 516
32mm bar column lapping we use welding binding what is dimension of welding as per stander code?  866
in 100 cft = 1350 bricks in 100 cft = ? bloks 1103
How much time Required for PPR pipe network testing 458
what is pouring and explain 629
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this?? 84
E-Mail New Answers        Answer Selected Questions