Answer Posted / ashvin prajapati
ELCB = EARTH LEAKAGE CIRCUIT BREAKER
IN CIRCUIT CURRENT FLOW BETWEEN PHASE AND NEUTRAL MORE THEN
30MA THAT TIME ELCB GET TRIPPED AND PROTECT THE PERSON OR A
MAJOR FAULT OR A BREKDOWN. GENERALLY ITS USE IN DOMECTIC
PURPOSE BUT ALSO USE IN INDUSTRIES ALSO.
ITS AVAILABLE IN SINGLE PHASE AND THREE PHASE
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)
boiler is running in rankine cycle and deisel generator is....?
Can we convert off line transformer to on line transformer
Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
Wt is the function of reactive power? How it generates & consume though resultant is zero?
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
if we look on phasor of the transformer vaoltage is 180 oppsite at primary and the secondary so to improve a power factor is secondary should kept negative to improve it primary side means is -.90 became +.90 at other side
can anyone explain 11kV 3core cable megger,hi pot test procedure with connection details?
i have to install a HT panel, what components, I have to use in this and what will the diagram of that diagram,please tell me each and everything.
I have 4 DG set with 1500KVA rating. system breakers are 11KV & alternator are 415 Volts. Between alternator & breaker one stepup transformer used. i want to Know what is max. resistance for body earthing & 415 & 11KV V Neuteal earthing. my fault current is 14 times for 2 sec.
state working of halogen lamp?
what is the excess air in furnace
Maintenance of transformer???
IN dc capacitive reactance is??
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?