what is periode of deshuttering for different area of slab
Answer Posted / nitin patil
What santosh kumar given answer is correct.but sometimes it is observed that for M20 grade slab deshuttering is done in 7-8 days.it depends on the material used also.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
which method is used in semi-rigid connection design??
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is the max. area can we apply the plate load test ?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is componsation
What year was the keystone power plant in Indiana County constructed?
what is m30 in concrete tiles
Why joints are provided?
Explain the mechanism of cavitations in pipes and drains?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
what is the use of beam end forces while using a staad ? wha they are show
In cement concrete how to check a quality of material also proportion of material at site ?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
how many kg of 20mm, 10mm, dust available in one ton stone boulder