I have used the proportion of cement:sand:gravel, is 1:2:4.
cement and the sand was provided by the company but i
provided the gravel. this combination was used to fill 500
cubic ft of wall. now i want to know how much gravel was
used in making the wall. can you guys please help me?
Answer Posted / bsjakhar
439.88 cft gravel is used
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
sir please send me campus placement questions in civil engineering
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
what is the breaking strength of wall tiles
How do you calculate reinforcement weight of steel?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What is Grid floor and mention its advantages ?
Explain the mechanism of cavitations in pipes and drains?
Define What is the tallest man made structure in the world?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
how i convert mm into standard wire guage (SWG)no.
what are the layers of the national and heir aprox thickness??
In earth work 1300 cum soil how to calculate how many liters require in water
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.